RCT0017 Automated RF/Microwave Test Station Designed, Built, and In Service
12/14/2011, 8:30:58 PM

An automated RF/Microwave Test Station was designed and built by R. A. Wood Associates. The purpose was to provide automated test and device characterization to:

  • Reduce manual test time
  • Eliminate errors in recording of results
  • Increase throughput
  • Eliminate manual RF connections and DC connections in mid-test
  • Provide automated test reports
  • Save test results electronically in a database structure

This automated test station reduced product test time from 24 hours of semi-automated testing down to approximately 2 hours. The RCT0017 Automated RF/Microwave Test Station includes:

  • DAQ/Switch Unit
  • Three programmable power supplies
  • Signal Generator
  • Spectrum Analyzer
  • Custom RF Switch/DIO Box
  • Table/Work Surface
  • Rack Mount Computer
  • Monitor
  • LabVIEW Software utilities to support setting up the Spectrum Analyzer and Signal Generator, retrieving data from the Spectrum Analyzer, controlling the RF Switch/DIO Box and other measurement equipment in the Test Station
  • Storage drawer

ManTech_480x640_1.png